政大機構典藏-National Chengchi University Institutional Repository(NCCUR):Item 140.119/85141
English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  全文笔数/总笔数 : 113656/144643 (79%)
造访人次 : 51749301      在线人数 : 604
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    政大機構典藏 > 商學院 > 統計學系 > 學位論文 >  Item 140.119/85141


    请使用永久网址来引用或连结此文件: https://nccur.lib.nccu.edu.tw/handle/140.119/85141


    题名: 半導體產業供應鏈網路資源分配模式之研究
    The Model of Resources Allocation in Supply Chain Network for Semiconductor Industry
    作者: 徐豐祺
    Hsu, Feng-Chi
    贡献者: 蔣明晃
    鄭宗記

    Chiang, Ming-Huang
    Cheng, Tsung-Chi

    徐豐祺
    Hsu, Feng-Chi
    关键词: 供應鏈管理
    半導體產業
    資源配置
    系統模擬
    啟發式演算法
    SCM
    Semiconductor Industry
    Resources Allocation
    Simulation
    Heuristic Algorithm
    日期: 2001
    上传时间: 2016-04-15 16:10:14 (UTC+8)
    摘要: 半導體生產的流程可分成四階段:晶圓生產(fabrication)、測試分類(sorting)、封裝(assembly)與檢驗(testing)。每個階段都有不同的廠商可提供服務。當晶圓生產廠商接獲訂單,其供應鍊管理者會根據產能、需求量、交貨日、技術水準與成本等考慮因素,決定此訂單應由何晶圓廠區生產、由何測試分類廠做分類、由何封裝廠做封裝與最後由何檢驗廠做檢驗。本研究的主要目的為在各種限制條件下,以最小成本為目標,找出完成客戶訂單的最佳廠商組合。可能的限制包括產能限制、交貨日的滿足、各廠區的技術水準及需求量的大小。本問題可視為產品組合、廠商組合與生產排程的綜合問題,過去常用的解決方法為整數與線性規劃的混合應用,但是由於牽涉的因素太多,常常問題的模式中變數與限制式過多導致無法解決。本研究先以資料的收集與模式的建構為主,利用並修改現有的產品結構樹模型使其變成供應鏈網路模式,並加入半導體產業供應鏈相關特性,建立一個以時間軸為機制的混合整數線性模式。並且以時間成本的概念來衡量整個半導體供應鏈的效能。
    參考文獻: Baatz, E.B.,“CIO 100–Best Practices: the Chain Gang,” CIO, Vol. 8, 1995, pp. 46-52.
    Benita, M.B.,“Supply Chain Design and Analysis: Models and Methods,” Vol. 55, 1998, pp. 281-294.
    Cohen, M.A., and H. Lee, “Manufacturing Strategy: Concepts and Methods. In: Kleindorfer PR, Editor. The Management of Productivity and Technology in Manufacturing,” New York: Plenum Press, 1987, pp. 153-183.
    David Simchi-Levi, Philip Kaminsky, and Edith Simchi-Levi, “Designing and Managing the Supply Chain,” USA, The McGraw-Hill Companies, Inc., 2000, pp. 1.
    Ellram, L.M., “A Managerial Guideline for the Development and Implementation of Purchasing Partnerships,” International Journal of Purchasing and Materials Management Vol. 27, 1991, pp. 2-8.
    Ellram, L.M., and Hendrick, T.E., “Partnering Characeristics: Adyadic perspective,” Journal of Business Logistics Vol. 16, 1995, pp. 41-64.
    Erenguc, S.S., N.C. Simpson, and A.J. Vakharia, “Integrated Production/Distribution Planning in Supply Chains: An invited review,” European Journal of Operational Research, Vol. 115, 1999, pp. 219—236.
    Farley, G.A., “Discovering Supply Chain Management: A roundtable Discussion,” APICS – The Performance Advantage, Vol. 7, 1997, pp. 38-39.
    Geoffrion, A.M., G.W. Graves, and S.J. Lee, “Strategic Distribution System Planning : A status Report,” In: Hax AC, editor. Studies in Operations Management. Amsteradm: North-Holland, 1978, pp. 178-314.
    Geoffrion, A.M., and R.F. Powers, “Twenty Years of Strategic Distribution System Design: An Evolutionary Perspective,” Interfaces, Vol. 25, 1995, pp. 105-128.
    Harland, C.M., “Supply Chain Management: Relationships, Chains and Networks,” British Academy of Management, Vol. 7, 1996, pp. S63-S80.
    Kim, Y.D., “On the Superiority of A Backward Approach in List Scheduling Algorithms for Multi-Machine Makespan Problems,” International Journal of Production Research, Vol. 25, 1987, pp. 1751-1759.
    Kim, Y.D., “A Comparison of Dispatching Rules for Job Shops with multiple Identical Jobs and Alternative Routings,” International Journal of Production Research, Vol. 28, 1990, pp. 953-962.
    Kim, Y.D., “A Backward Approach in List Scheduling Algorithms for Multi-Machine Tardiness Problems,” Computers and Operations Research, Vol. 22, 1995, pp. 307-319.
    Landeros, R., R. Reck,, and R.E. Plank, “Maintaining Buyer-Supplier Partnership,” International Journal of Purchasing and Materials Management, Vol. 31, 1995, pp. 3-11.
    Lee, H., and C. Billlington, “Management Supply Chain Inventory Pitfalls and Oppportunities,” Sloan Management Review, Vol. 33, 1992, pp. 65-73.
    Lee, H., C. Billington, and B. Carter, “Hewlett-Packard Gains Control of Inventory and Service through Design for Localization,” Interfaces, Vol. 23, 1993, pp. 1-11.
    Matthyssens, P., and C. Van den Bulte, “Getting Closer and Nicer: Partnerships in the Supply Chain,” Long Range Planning, Vol. 27, 1994, pp. 72-83.
    New, S.J., and P. Payne, “Research Frameworks in Logistics: Three Models, Seven Dinners and A Survey,” International Journal of Physical Distribution and Logistics Management, Vol. 25, 1995, pp. 60-77.
    Jose Manuel Padillo, Ricki Ingalls, and Steven Brown, “A Strategic Decision Support System for Supply Network Design and Management in the Semiconductor Industry,” Computers Industry Engineering, Vol. 29, 1995, pp. 443-447.
    Ptak, C. A., “ERP: Tools, Techniques, and Applications for Integration the Supply Chain,” 1999, USA, CRC Press LLC, pp. 15-35.
    Park. M.W., and Y.D. Kim, “A Branch and Bound Algorithm for A Production Scheduling Problem in An Assembly System under Due Date Constraints,” European Journal of Operational Research, Vol. 123, 2000, pp. 504-518.
    Pyke, D.F., and M.A. Cohen, “Performance Characteristics of Stochastic Integrated Production-Distribution Systems,” European Journal of Operational Research, Vol. 68, 1993, pp. 23-48.
    Robinson, P.E., L.L. Goa, and S.T. Muggenborg, ”Designing An Integrated Distribution System at Dowbrands,” INC. Interfaces, Vol. 23, 1993, pp. 17-107.
    Rupp T.M., and M. Ristic, “Fine Planning for Supply Chains in Semiconductor Manufacture,” Journal of Materials Processing Technology, Vol. 107, 2000, pp. 390-397.
    Russell, R.S., E.M. Darel, and B.W. Talor III, “A Comparative Analysis of the COVERT job Sequencing Rule Using Various Shop Performance Measures,” International Journal of Production Research, Vol. 25, 1987, pp. 1523-1540.
    Tan, K.C., “A Framework of Supply Chain Management Literature,” European Journal of Purchasing & Supply Management, Vol. 7, 2001, pp. 39-48.
    Toktay L.B., and Uzsoy Reha, “A Capacity Allocation Problem with Integer Side Constraints,” European Journal of Operational Research, Vol. 109, 1998, pp. 170-182.
    Tzafestas, S., and G. Kapsiotis, “Coordinated Control of Manufacturing/Supply Chains Using Mult-Level Techniques,” Computer Integrated Manufacturing Systems,” Vol. 7, 1994, pp. 21-206.
    Vepsalainen, A., and T.E. Morton, “Priority Rules for Job Shop with Weighted Tardiness Cost,” Management Science, Vol. 33, 1987, pp. 1035-1047.
    描述: 碩士
    國立政治大學
    統計學系
    88354023
    資料來源: http://thesis.lib.nccu.edu.tw/record/#A2002001354
    数据类型: thesis
    显示于类别:[統計學系] 學位論文

    文件中的档案:

    没有与此文件相关的档案.



    在政大典藏中所有的数据项都受到原著作权保护.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈