English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 113656/144643 (79%)
Visitors : 51747092      Online Users : 616
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    政大機構典藏 > 商學院 > 資訊管理學系 > 學位論文 >  Item 140.119/35219
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/35219


    Title: 供應商績效評估研究-結合ANP及DEMATEL之應用
    Authors: 紀岱玲
    Contributors: 林我聰
    紀岱玲
    Keywords: 供應商績效評估
    分析網路程序法
    決策實驗室法
    Date: 2005
    Issue Date: 2009-09-18 14:28:40 (UTC+8)
    Abstract: 供應商績效評估一直都是供應鏈管理重要的課題,企業中的採購部門必須定期的評估供應商的績效,以期望供應商能達到企業的需求。在進行供應商評估時,必須同時考慮多個指標及決定指標的權重,由於指標間具有相依及回饋的情形,因此權重的決定也較為複雜,此外,由於績效指標有互相影響的情形,指標間的關連度也是評估供應商時必須考慮的問題。本研究提出一個新的供應商績效評估方法,結合分析網路程序法(Analytic Network Process, ANP)及決策實驗室法(Decision making trial and evaluation laboratory, DEMATEL)建構評估模式,以達到正確的評估供應商績效,及可回溯績效表現找出關鍵改善原因之目的。
    在進行供應商績效評估時,利用分析網路程序法求出各指標的權重,量化指標並求得供應商的總分;另外利用決策實驗室法得知各指標的因果關係及關連度大小,當檢視供應商績效時,可從權重大或關連度大但表現差的指標回溯,以提供供應商改善的方向。最後以模擬的方式進行驗證,結果顯示本研究對指標之排序符合模擬之結果,因此可供企業參考使用。
    Supplier performance evaluation for some time now has been receiving increasing importance as a supply chain management component. Purchasing managers need to periodically evaluate supplier performance in order to retain those suppliers who meet their requirements. Buyers usually consider multi-criteria and must determine the relative weights of the criteria when evaluating suppliers. Because of these performance criteria usually exist interdependence and feedback, the weights of the criteria are hard to obtain. In addition, performance criteria usually affect each other, so the direct and indirect effects are also a crucial problem when evaluating suppliers. This paper proposes a model which combines the methods of the analytic network process (ANP) and the decision making trial and evaluation laboratory (DEMATEL) to evaluate supplier performance accurately and can find out which criterion is the key factor to improve performance.
    When evaluating a supplier, ANP are used to determine the weights of performance criteria and can get the total performance of the supplier. DEMATEL are used to compute the effects between criteria. The model can propose the criterion which is the most important or affects other criteria the most, so buyers will know which criterion can improve the performance the most and can ask suppliers to modify it. Finally, a simulation is employed to verify our model. The result through the simulation is complied with our model, so it can provide the information for making decision concerning suppliers performance.
    Reference: 一、中文部分
    1. 林宗明、民94,管理問題因果複雜度分析模式建立之研究─以DEMATEL為方法論,中原大學企業管理研究所碩士論文。
    2. 胡秀珍、民92,供應商評估選擇與其影響原因之探討,國立高雄第一科技大學運輸與倉儲營運研究所碩士論文。
    3. 胡雪琴、民92,企業問題複雜度之探討及量化研究--以DEMATEL為分析工具,私立中原大學企業管理研究所碩士論文。
    4. 陳虹遐、民93,應用分析網路程序法於液晶電視之生態效益評估,國立成功大學工業設計研究所碩士論文。
    5. 陳貴琳、民92,供應商績效評估與品質改善模式,國立交通大學工業工程管理研究所博士論文。
    6. 黃敏宗、民93,以平衡計分卡建構逆向物流業者績效評估模式之研究,南台科技大學工業管理研究所碩士論文。
    7. 廖慈惠、民92,製造商領導之供應鏈合作規劃架構,元智大學資訊管理研究所碩士論文。
    二、英文部分
    1. Bititci U.S., Suwignjo P., and Carrie A.S. “Strategy management through quantitative modeling of performance measurement systems,” International Journal of Production Economics (69) 2001, pp:15-22
    2. Bolaños R., Fontela E., Nenclares A. and Pastor P. “Using interpretive structural modelling in strategic decision-making groups,” Management Decision (43:6) 2005, pp:877-895
    3. Chen I. J. and A. Paulraj, “Understanding supply chain management: critical research and a theoretical framework”, International Journal of Production Research(42:1) 2004, pp: 131–163
    4. De Boer, L. and E. Labro, P. Morlacchi. “A review of methods supporting supplier selection,” European Journal of Purchasing and Supply Management (7)2001, pp:75-89
    5. Dickson, G. “An analysis of vendor selection systems and decisions,” Journal of Purchasing (2)1966, pp:28–41
    6. Ellram, L.M. “The supplier selection decision in strategic partnerships,” Journal of Purchasing and Materials Management (26:4)1990, pp:8–14
    7. Fontela E. and Gabus A. “Current perceptions of the world problematique,” in Churchman, C.W. and Mason, R.A. (Eds), World Modeling: A Dialogue, North Holland/Elsevier, Amsterdam/New York, 1976
    8. Huang J.J., Tzeng G.H., and Ong C.S. “Multidimensional data in multidimensional scaling using the analytic network process,” Pattern Recognition Letters (26) 2005, pp:755-767
    9. Hiroyuki Tamura, Haruna Nagata, and Katsuhiro Akazawa. “Structural modeling and systems analysis of various factors for realizing safe, secure, and reliable society.” Scientific Research (Project No. 13GS0018) ,2003
    10. Jain, V., Tiwari, M.K. and Chan, F.T.S. “Evaluation of the supplier performance using an evolutionary fuzzy-based approach,” Journal of Manufacturing Technology Management (15:8) 2004, pp:735-744
    11. Kannan, V.R. and Tan, K.C. “Supplier selection and assessment: their impact on business performance, ”Journal of Supply Chain Management (38:4) 2002 pp:11-21
    12. Krause, D.R. and Ellram, L.M. “Critical elements of supplier development,” European Journal of Purchasing & Supply Management (3:1)1997, pp:21-31
    13. Lin Chi-Jen and Wu Wei-Wen “A fuzzy extension of the DEMATEL method for group decision making,” 第一屆作業研究學會學術研討會論文集,台北科技大學,台灣 (2004)
    14. Lasch, R and Janker, C.G.. “Supplier selection and controlling using multivariate analysis,” International Journal of Physical Distribution &Logistics Management (35:6) 2005, pp:409-425
    15. Melnyk S.A., Stewart D.M., and Swink M. “Metrics and performance measurement in operations management: dealing with the metrics maze,” Journal of Operations Management (22) 2004, pp:209-217
    16. Muralidharan C., Anatharaman N. and Deshmukh S.G. “A multi-criteria group decision making model for supplier rating,” Journal of Supply Chain Management (38:4)2002, pp:22–33
    17. Pi W.-N. and Low C. “Supplier evaluation and selection via Taguchi loss functions and an AHP,” International Journal of Advanced Manufacturing Technology (27:5-6) 2006, pp:625-630
    18. Prahinski C. and Benton W.C. “Supplier evaluations: communication strategies to improve supplier performance,” Journal of Operations Management (22) 2004, pp:39-62
    19. Ricardo B., Emilio F., Alfredo N., and Pablo P. “Using interpretive structural modeling in strategic decision-making groups,” Management Decision(43:6)2005, pp:877-895
    20. Sarkis, J. “Quantitative models for performance measurement systems-alternate considerations,” International Journal of Production Economics (86) 2003, pp:81-90
    21. Sarkis, J. and Talluri, S. “A model for strategic supplier selection,” Journal of Supply Chain Management(38:1) 2002, pp:18–28
    22. Satty, T.L. Decision making with dependence and feedback: The analytic network process, 2nd ed, RWS Publications, Pittsburgh, USA, 2001
    23. Simpson, P.M., Siguaw, J.A. ,and White, S.C. “Measuring the performance of suppliers: an analysis of evaluation processes,” Journal of Supply Chain Management (38:1) 2002, pp:29-41
    24. Suwignjo P., Bititci U.S. ,and Carrie A.S. “Quantitative models for performance measurement system,” International Journal of Production Economics (64) 2000, pp:231-241
    25. Stevenson, William J. Operations Management, Boston : McGraw-Hill/Irwin, c2002
    26. Talluri, S. and Narasimhan, R. “Vendor evaluation with performance variability: A max-min approach,” European Journal of Operational Research(146) 2003, pp:543-552
    27. Tan, K.C., Kannan, V.R. and Handfield, R.B. “Supply chain management: supplier performance and firm performance,” International Journal of Purchasing and Materials Management (34:3) 1998, pp:2-9
    28. Tan, K.C. and Kannan, V.R. “Supplier selection and assessment: their impact on business performance,” Journal of Supply Chain Management (38:4) 2002, pp:11-21
    29. Thompson, K.N. “Scaling evaluative criteria and supplier performance estimates in weighted point prepurchase decision model,” International Journal of Purchasing and Materials Management (27:1)1991, pp:27-36
    30. Weber, Charles A., Current, John R. and Benton, W.C. “Vendor selection criteria and methods,” European Journal of Operational Research (50:1)1991, pp:2-18
    31. 潘俊宏、民94,一衡量供應鏈績效之整合性架構,國立中央大學工業管理研究所碩士論文。
    Description: 碩士
    國立政治大學
    資訊管理研究所
    93356011
    94
    Source URI: http://thesis.lib.nccu.edu.tw/record/#G0093356011
    Data Type: thesis
    Appears in Collections:[資訊管理學系] 學位論文

    Files in This Item:

    File Description SizeFormat
    35601101.pdf61KbAdobe PDF21148View/Open
    35601102.pdf58KbAdobe PDF21413View/Open
    35601103.pdf12KbAdobe PDF21141View/Open
    35601104.pdf69KbAdobe PDF21151View/Open
    35601105.pdf81KbAdobe PDF22396View/Open
    35601106.pdf112KbAdobe PDF22422View/Open
    35601107.pdf467KbAdobe PDF28503View/Open
    35601108.pdf316KbAdobe PDF210723View/Open
    35601109.pdf367KbAdobe PDF22513View/Open
    35601110.pdf85KbAdobe PDF21499View/Open
    35601111.pdf124KbAdobe PDF21500View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback