Reference: | Agarwal, A., & Sarkis, J., (1998). A review and analysis of comparative performance studies on functional and cellular manufacturing layouts. Computer & Industrial Engineering, 34(1), 77-89. Ang, C. L., & Willey, P. C. T., (1984). A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation techniques. International Journal of Production Research, 22(2), 193-233. Askin, R. G., & Chen, J., (2006). Dynamic task assignment for throughput maximization with worksharing. European Journal of Operational Research, 168(3), 853-869. Bokhorst, L. A. C., Slomp, J., & Gaalman, G. J. C., (2004). On the who-rule in Dual Resource Constrained (DRC) manufacturing systems. International Journal of Production Research, 42(23), 5049-5074. Brusco, M. J., & Johns, T. R., (1998). Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies. Decision Sciences, 29(2), 499-515. Burgess, A.G., Vollmann, T.E., & Morgan, I., (1993). Cellular manufacturing: its impact on the total factory. International Journal of Production Research, 31(8), 2059-2077. Cesani, V. I., & Steudel, H. J., (2005). A study of labor assignment flexibility in cellular manufacturing systems. Computer & Industrial Engineering, 48(3), 571-591. Eckstein, A. L. H., & Rohleder, T. R., (1998). Incorporating human resources in group technology / cellular manufacturing. International Journal of Production Research, 36(4), 1199-1222. Felan, J. T., & Fry, T. D., (2001). Multi-level heterogeneous worker flexibility in a dual resource constrained (DRC) job-shop. International Journal of Production Research, 39(14), 3041-3059. Flynn, B. B., (1987). Repetitive lots: the use of a sequence dependent set-up time scheduling procedure in grouping technology and traditional shops. European Journal of Operational Management, 7(2), 203-216. Flynn, B. B., & Jacobs, F. R., (1986). A simulation comparison of group technology with traditional job shop manufacturing. International Journal of Production Research, 24(5), 1171-1192. Garza, O., & Smunt, T. L., (1991). Countering the negative impact of inter-cell flow in cellular manufacturing. Journal of Operations Management, 10(1), 92-118. Gel, E. S., Hopp, W. J., & Van Oyen, M. P., (2002). Factors affecting opportunity of worksharing as a dynamic line balancing mechanism. IIE Transactions, 34(4), 847-863. Hopp, W., & Van Oyen, M. P., (2004). Agile workforce evaluation: a framework for cross-training and coordination. IIE Transactions, 36(4), 919-940. Huq, F., Hensler, D. A., & Mohamed, Z. M., (2001). A simulation analysis of factors influencing the flow time and through-put performance of functional and cellular layouts. Integrated Manufacturing, 12(4), 285-295. Jensen, J. B., (2000). The impact of resource flexibility and staffing decisions on cellular and departmental shop performance. European Journal of Operational Research, 127(1), 279-296. Jensen, J. B., Malhotra, M. K., & Philipoom, P.R., (1996). Machine dedication and process flexibility in a group technology environment. Journal of Operations Management, 14(1), 19-39. Kannan, V. R., & Ghosh, S., (1996). Cellular manufacturing using virtual cells. International Journal of Production Research, 16(1), 99-112. Kannan, V. R., & Palocsay, S. W., (1999). Cellular vs process layouts: an analytic investigation of the impact of learning on shop performance. Omega, 27(6), 583-592. Kumar, N., & Shanker, K., (2001). Comparing the effectiveness of workload balancing objectives in FMS loading. International Journal of Production Research, 39(5), 843-871. Kuula, M., & Stam, A., (1999). Workload balancing in the manufacturing environment: a multicriteria trade-off analysis. International Journal of Production Research, 37(7), 1459-1477. McCreery, J. K., & Krajewski, L. J., (1999). Improving the equality of workload assignments in assembly lines environment with learning and forgetting effects. International Journal of Production Research, 37(9), 2031-2058. Morris, S. J., & Tersine, R. J., (1990). A simulation analysis of factors influencing the attractiveness of group technology cellular layouts. Mangement Science, 36(12), 1567-1578. Noeman, B. A., & Tharmmaphornphilas, W., (2005). Human related issues in manufacturing cell design, implementation, and operation. Computer & Industrial Engineering, 48(2), 507-523. Noeman, B. A., Tharmmaphornphilas, W., Needy, K. L., Bidanda, B., & Warner, R. C. (2002). Worker assignment in cellular manufacturing considering technical and human skills. International Journal of Production Research, 40(6), 1479-1492. Schultz, K. L., McClain, J. O., & Thomas, L. J., (2003). Overcoming the dark side of worker flexibility. Journal of Operations Management, 21(1), 81-92. Sennott, L. I., Van Oyen, M. P., & Iravani, M. R., (2006). Optimal dynamic assignment of a flexible worker on an open production line with specialists. European Journal of Operational Research, 170(2), 541-566. Shafer, S. M., & Charnes, J. M., (1993). Cellular versus functional layouts under a variety of shop operating conditions. Decision Science, 24(2), 665-681. Shambu, G., & Sureah, N. C., (2000). Performance of hybrid cellular manufacturing systems: A computer simulation investigation. European Journal of Operational Research, 120(2), 436-458. Slomp, J., Bokhorst, J. A.C., & Molleman, E., (2005). Cross-training in a cellular manufacturing environment. Computer & Industrial Engineering, 48(3), 609-624. Slomp, J., & Molleman, E., (2001). The impact of technological innovations on work design in a cellular manufacturing environment. New Technology, Work, and Employment, 16(3), 152-155. Suer, G. A., & Dagli, C., (2005). Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells. Computer & Industrial Engineering, 48(3), 643-655. Suresh, N. C., (1991). Partitioning work centres for group technology: insights from an analytical model. Decision Science, 22(3), 772–791. Suresh, N. C., (1992). Partitioning work centres for group technology: analytical extension and shop-level simulation investigation.Decision Science, 23(1), 267-290. Suresh, N. C., & Gaalman, G. J. C., (2000). Performance evaluation of cellular layouts: extension to DRC system contexts. International Journal of Production Research, 38(17), 4393-4402. Suresh, N. C., & Meredith, J. R., (1994). Coping with the loss of pooling synergy in cellular manufacturing systems. Mangement Science, 40(4), 466-483. Suresh, N. C., & Slomp, J., (2005). Performance comparison of virtual cellular manufacturing with functional and cellular layouts in DRC setting. International Journal of Production Research, 43(5), 945-979. Treleve, M., (1989). A review of the dual resource constrained system research. IIE Transactions, 21(3), 279-287. Van Oyen, M. P., Gel, E. G. S., & Hopp, W. J., (2001). Performance opportunity for workforce agility in collaborative and noncollaborative work systems. IIE Transactions, 33(9), 761-777. |