Reference: | 參考書目
1. Adolphson, D.L., " Single machine job sequencing with precedence constraints " , SIAM J. Computing , 6(1) , 40 - 54 . (1977)
2. Akers, S.B., " A graphical approach to production scheduling problems. " Operations Research , 4(2) , 244 - 245 , (1956)
3. Ashour, S., Moore, T.E. and Chin, N.K., " An implicit enumeration algorithm for the nonpreemptive shop scheduling problem " . AIIE Transactions , 6(1) , 62 - 72 , (1974)
4. Bagga, P.C.. " N-job, 2-machine sequencing problem with stochastic service times" , Opsearch , 7 , 184 - 197 , (1970)
5. Baker, K.R., Introduction to sequencing and scheduling . John Wiely & Sons , N.Y. , (1974)
6. Baker, K.R. and Schrage .L.E., " Finding an optimal sequence by dynamic programming : an extension to precedence related tasks " Operations Research . 26(1) , 111 - 120 . (1978a)
7. Bakshi, M.S. and Arora, S.R.. " The sequencing problem " , Management Science , 16(4) . B247 - B263 . (1969)
8. Bellman, R., Dynamic programming , Princeton university press , Princeton N.J. (1957)
9. Bowman, E.H., " The schedule-sequencing problem Operations Research , 7(4) . 621 – 624 . (1959)
10. Box, G.E.P. and Muller, M.E., " A note on the generation of random normal deviates " , Ann. Math. Stat. , 29(2) .. 610 - 611 . (1958)
11. Brooks G.H. and White, C.R.. " An algorithm for finding optimal or near optimal solutions to the production scheduling problem " . Journal of Industrial Engineering . 16(1) : 34 - 40 . (1965)
12. Bruno, J. and Downey, P., " Sequencing tasks with exponential service times on two machines " , Technical report, Department of electrical engineering and computer science , University of California , at Santa Barbara , (1977)
13. Burns , R.N. and Steiner. G.. " Single machine scheduling with series - parallel precedence contraints " Research report Corr 81-5. Department of combinatories and optimization , The university of Waterloo , Waterloo , Canada . (1981)
14. Coffman, E.G., Computer and job - shop scheduling theory . John Wiley & Sons , N.Y. (1976)
15. Coffman, E.G. and Graham, R.L., " Optimal scheduling for two-processor system" . Acta Information , 1(3) , 200 - 213 , (1972)
16. Conway, R.W., Maxwell. W.L. and Miller. L.W., Theory of scheduling . Addison-Wesley , Reading , Mass . (1967)
17. Cunningham, A.A. and Dutta, S.K.. " Scheduling jobs with exponentially distributed processing times on two machines of a flow shop " . Naval Research Logistics Quarterly , 16(1) , 69 - 31 . (1973)
18. Dempster, M.A.H. Lenstra, J.K. and Rinooy Kan, A.H.G., Deterministic and stochastic scheduling . D.Reidel Publishing Company , Holland . (1982)
19. Denardo, E.W. Dynamic Programming : models and application . Pentice - Hall . Englewood Cliffs , N.J. (1982)
20. Derman, C., Lieberman, G. and Ross, S., " A renewal decision problem " Management Science , 24(5) , 554 - 561 , (1978)
21. Fisher, M.L., " A dual algorithm for the one-machine scheduling problem " Mathematical Programming , 11(2) , 458 - 481 .. (1976)
22. French. S., Sequencing and scheduling : An introduction to the mathematics of the job-shop . John Wiely & Sons , N.Y. , (1982)
23. Garey, M.R. " Optimal binary identification procedures " , SIAM Journal on Applied Mathematic , 23(2) , 173 - 186 . (1972)
24. Garey, M.R. and Joshon, D.S., " Two-processor scheduling with start-times and deadlines " . Bell Laboratories , Murray Hill , N.J. (1975)
25. Gelders, L. and Kleindorfer, P.R., " Coordinating aggregate and detailed scheduling in a one-machine job shop , part I, theory " . Operations Research, 22(1) , 46 - 60 . (1974)
26. Geoffrion , A.M., " Duality in nonlinear programming . a simplified applications oriented development " , SIAM Review , 13(1) , 1 - 37 . (1971)
27. Gilmore, P.C. and Gomory, R.E., " Sequencing a one-state variable machine : a solvable case of the traveling salesman problem " , Operations Research , 12(4) , 555 - 679 . (1964)
28. Glazebrook, K.D., " On single machine sequencing with order constraints " Naval Research Logistics Quarterly , 27 . 123 -130. (1980)
29. Gonzalez, T. and Sahni, S., " Flowshop and jobshop schedules : complexity and approximation " Operations Research , 26(1) , 36 - 52 . (1978)
30. Graybill, F.A.. Theory and application of the linear model , Duxbury Press . North Scituate , Massachusetts . (1976)
31. Hariri, A.M.A. and Potts.C.M., " Algorithm for two machine flow shop sequencing with precedence constraints " Europ.J.of.0ps.Res., 17(2) , 238 - 248 . (1984)
32. Held. M., Karp, R.M., " A dynamic programming approach to sequencing problems " , J. SIAM , 10(2) , 196 -210 . (1962)
33. Held, M., Karp, R.M. and Shareshian, R., " Assembly - line balancing : dynamic programming with precedence constraints " , Operations Research , 11(3) , 442 - 459 . (1963)
34. Heller, J., " Some numerical experiments for an M x J flow-shop and its decision theoretical aspects " . Operations Research, 8(1) , 178 - 184 . (1960)
35. Horn, W.A., " single-machine job sequencing with treelike precedence ordering and linear delay penalties " , SIAM J. Appl. Math , 23(2) , 189 - 202 . (1972)
36. Hu, T.C., " Parallel sequencing and assembly line problem " , Operations Research , 9(6) , 841 -848 . (1961)
37. Ignall. E. and Schrage, L., " Application of the branch-and-bound technique to some flow-shop scheduling problems " , Operations Research , 13(3) , 400 - 412 . (1965)
38. Jackson, J.R., " An extension of Johnson`s results on job lot scheduling " Naval Research Logistics Quarterly , 3 201 - 203 . (1956)
39. Johnson, R.A. and Wichern, D.W., Applied multivariate statistical analysis. Prentice - Hall , Englewood Cliffs , N.J. (1982)
40. Johnson, S.M., " Optimal two or three-stage production schedules with setup times included " . Naval Research Logistics Quarterly, 1(1) , 61 - 68 . (1954)
41. Lageweg, B.J., Lenstra, J.K. and Rinnooy Kan, A.H.G., " Minimizing maximum lateness on one machine : computation experience and some application" , Statistca Neerlandica , 30 , 25 - 41 , (1976)
42. Law. A.M. and Kelton, W.D., Simulation modeling and analysis. McGraw - Hill , (1982)
43. Lawler, E.L., " On scheduling with deferral costs " , Management science , 11(3) , 280 - 288 . (1964)
44. Lawler, E.L., " Optimal sequencing of a single machine subject to precedence constraints " , Management science , 19(5) , 544 - 546 . (1973)
45. Lenstra, J.K.. Sequencing by enumerative methods. Mathematisch Centrum , Amsterdam , (1977)
46. Marsaglia, G. and Bray, T.A., " A convenient method for generating normal variables " SIAM Review , 6(2) , 260 - 264 . (1964)
47. Mcmahon, G.B., " Optimal production schedules for flow shops " . Operations Research , 15(3) , 473 - 481 , (1967)
48. Mcmahon, G.B. and Florian, M., " On scheduling with ready time and due dates to minimizing maximum lateness " . Operations Research. 23(3) , 475 - 482 . (1975)
49. McNaughton, R. " Scheduling with deadlines and loss functions " . Management Science , 6(1) , 1 - 12 . (1959)
50. Michael, H.R.. " Scheduling independent tasks on parallel processor " Management Science , 12(5) , 437 -447 . (1966)
51. Mitten, L.G., "Precedence order dynamic programming" Management Science , 21(1) , 43 - 46 . (1974)
52. Monma, C.L., " Sequencing with general precedence constraints. " Discrete Appl. Math , 3 , 137 -150 . (1981)
53. Moore, J.M., " An n job, one machine sequencing algorithm for minimizing the number of late jobs " , Management Science , 15(1) , 102 - 109 . (1968)
54. Morton, T.E. and Dharan, B.G.. " Algoristics for single machine sequencing with precedence constraints. " Management Science, 24(10) , 1011 - 1020 . (1978)
55. Panwalkar, S.S. and Khan, A.W... " An order flow shop sequencing with mean completion time criterion " Int. J. Prod. Res. , 14 , 631 - 635 , (1981)
56. Panwalkar. S.S. and Woollam, C.R.. " Ordered flow shop problems with no in-process waiting : further result " , J.Opl.Res.Soc. 31 , 1039 - 1043 . (1980)
57. Pinedo, M.L. and Weiss, G., " Scheduling of stochastic tasks on two parallel processors " , Naval Research Logistics Quarterly , 26 . 527 -535. (1979)
58. Pinedo, M.L., " Minimizing makespan with bimodal processing time distribution " Management Science , 27 (5) . 582 - 586 . (1981)
59. Pinedo, M.L.. " A note on the two machine job shop with exponential processing times " Naval Research Logistics Quarterly , 28 . 693 - 696. (1981)
60. Pinedo. M.L., " Minimizing the expected makespan in stochastic flow shops " Operations Research , 30(1) , 148 - 162 . (1982)
61. Pinedo, M.L. and Ross, S.M.. " Minimizing the expected makespan in stochastic open shop " Adv. in Appl. Probab., 14 , 898-911 , (1982)
62. Pinedo, M.L., " Stochastic scheduling with release dates and due dates " Operations Research , 31(3) , 559 - 572 . (1983)
63. Pinedo, M.L., " A note on stochastic shop models in which jobs have the same processing requirements on each machine " Management Science , 31(7) , 840 - 846 , (1985)
64. Potts, C.N., " A lagrangean based branch and bound algorithm for single machine sequencing with precedence constraints to minimizing total weighted completion time " . Management Science , 31 (10) , 1300 - 1311 . (1985)
65. Pritsker, A.A.B., Watters, L.J. and Wolfe , P.M., " Multiproject scheduling with limited resources: a zero-one programming approach " . Management Science , 16(1) , 93 - 108 . (1969)
66. Reddi, S.S. and Ramamoorthy, "On the flow-shop sequencing problem with no wait in process " , Operational Research Quarterly , 23 , 323 - 331 , (1972)
67. Rinnooy Kan, A.H.G. Machine scheduling problems , Martinus Nijhoff , The Hague , (1976)
68. Rinnooy Kan, A.H.G., Lazeweg, B.J. and Lenstra, J.K, " Minimizing total costs in one machine scheduling " , Operations Research , 23(5) , 908 -927 . (1975)
69. Ross, S., Introduction to stochastic dynamic programming. Academic Press , N.Y. (1983)
70. Schild, A. and Fredman, I.J., " On scheduling tasks with associated linear loss function " , Management Science , 7(3) , 280 - 285 , (1961)
71. Schrage, L.E. and Baker, K.R., "Dynamic programming solution of sequening problem with precedence constraints " Operations Research . 26(3) . 444 - 449. (1978b)
72. Sidney, J.B., "A decomposition algorithm for sequencing with general precedence constraints" . Math. of Ops. Res., 6(2) , 190 -204 . (1981)
73. Sidney, J.B. and Steiner, G., " Optimal sequencing by modular decomposition: Polynomial algorithm " , Operations Research , 34(4) . 606 - 612. (1986)
74. Smith, W.E., "Various optimizers for single-state production" . Naval Research Logistics Quarterly, 3(1), 59 - 66 . (1956)
75. Smith, R.D. and Dudek, R.A., " A general algorithm for the solution of the n-job, m-machine sequencing problem of the flowshop " , Operations Research , 15(1) . 71 - 82 . (1967)
76. Steiner, G., "Single machine scheduling with precedence constraints of dimension ? " . Mathematics of Operations Research , 9(2) , 248 -259 . (1984)
77. Szwarc. W... "Solution of the Akers-Friedman scheduling problem " Operations Research , 8 , 782 -788 . (1960)
78. Szwarc, W., " Elimination method in the m x n sequencing problem " , Naval Research Logistics Quarterly , 18 , 295 - 305 , (1971)
79. Szwarc, W., " A note on the flow-shop problem without interruptions in job processing " Hayal Research Logistics Quarterly , 28, 665 - 669 , (1981)
80. Viviers, F., "A decision support system for job shop scheduling" . Europ. J. of Ops. Res . 14(1) , 95 -103 , (1983)
81. Wagner, H.M., "An integer programming model for machine scheduling" Naval Research Logistics Quarterly , 6, 131 - 140 . (1959)
82. Weber, R.R., " The interchangeability of tandom /M/1 queues in series " , J. Appl. Probab , 16(3) , 689 - 697 , (1979)
83. Weiss, H., "A greedy heuristic for single machine sequencing with precedence constraints" . Management Science , 27(10) , 1209 - 1215 , (1981)
84. Wismer, D.A., "Solution of the flowshop scheduling problem with no intermediate queues " . Operations Research. 20(3), 689 - 697. (1972)
85. Yu, C.C.. The optimization of stochastic multiperiod systems by an implicit dynamic programming approach. Ph. D. Dissertation , J.T. Austin , (1985)
86. Yu, C.C.. Three tree structures for data processing in dynamic programming computation. Master Dissertation , U.T. Austin , (1983)
87. 許淑卿,多變量模擬輸出之統計分析,國立政治大學統計研究所碩士論文,(民國76年).
88. 黃欣伸,排程的隨機動態規劃模型及其在管理上的應用,國立政治大學統計研究所碩士論文,(民國75年). |