Reference: | [1]Alt, F.(1981), “One Control Chart for the Mean and Variance”, Proceeding of Industrial Engineering Conference, Washington, D. C. pp143-145.
[2]Banerjee, P. and Rahim, M. (1987), “ The Economic Design of Control Charts : A Renewal Theory Approach” , Engineering Optimization, Vol. 12, pp63-73.
[3]Besterfield, D. (1979), Quality Control, Prentice-Hall, Englewood Cliffs, N. J.
[4]Chung, K. and Chen, S. (1992), “ Joint Economically Optimal Design of X and S2
Control Charts”, Engineering Optimization, Vol. 19, pp101-113.
[5]Collani, V. and Sheil, J. (1989), “An Approach to Controlling Process Variability”, Journal of Quality Technology, Vol. 21, no.2, April, pp87-96.
[6]Duncan, A. (1956), “ The Economic Design of X chart Used to Maintain Current Control of a Process”, Journal of the American Statistical Association, Vol. 51, pp228-242.
[7]Duncan, A. (1971), “The Economic Design of X Charts When There is a Multiplicity of Assignable Causes”, Journal of the American Statistical Association, Vol. 66, no.33, pp107-121.
[8]Duncan, A. (1974), Quality Control and Industrial Statistics, Richard D. Irwin. Inc
[9]Gitlow, H., Gitlow, S., Oppenheim ,A. and Oppenheim ,R.,(1989), Tools and Methods for the Improvement of Qualitv, Richard D. Irwin,Inc.
[10]IMSL Library (1989) , User’s Manual Math/Library, Fortran Subroutines, IMSL, Inc.
[11]Juran, J. (1979), Quality Control Handbook, McGraw-Hill, Inc.
[12]Montgomery, D. (1980), “The Economic Design of Control Charts : A Review and Literature Survey”, Journal of Quality Technology, Vol.12,NO.2, April, pp75-86.
[13]Moen, R., Nolan, T. ,and Provost, L.(1991), Improving Quality Through Planned Experimentation, McGraw-Hill,Inc.
[14]Panagos, M. ,Russell, H. and Montgomery, D. (1985),” Economic Design of X Charts: For Two Manufacturing Models” , Naval Research LogisticsQuarterly, Vol. 32. pp631-646.
[15]Rahim, M., Lashkari, R. and Banerjee, P. (1988).” Joint Economic Design of Mean and Variance Control Charts”, Engineering Optimization, 14, pp65-78.
[16]Ross, S. (1989), Introduction to Probability Models, Academic Press.
[17]Saniga, E. (1979), “Joint Economically Optimal Design of X and R Control Charts”, Management Science, Vol. 24, No.4, pp420-431.
[18]Spanos, C. (1992), “Statistical Process Control in semiconductor Manufacturing”,Proceeding of IEEE, June.
[19]Shewhart W. (1931), Economic Control of Quality of Manufactured Product, D. Van Nostrand Company, Inc.
[20]Yang, S. (1993).”Economic Design of Joint X and R Control Charts : A Markov Chain Method”, JNCU, Vol. 66, No.2, pp445-494. |