Reference: | (一)英文部份
1. Adiga, S., Object-oriented Software for Hanufacturing
Systems, Chapman & Hall (1993) .
2. Ad iga, S. and W. T. Lin, “An Object- Oriented Architecture for Knowledge-Based Production Scheduling Systems," Journal of Intelligent Manufacturing, Vo1.4, pp.139-150 (1993) .
3. Askin, R. G. and C. R. Standridge, 1rI0deling And Analysis Of Manufacturing Systems, John Wiley & Sons (1993) .
4. Banerjee, S. and D. Y. Golhar, "EDI Implementation : A
Comparative Study of JIT and Non -JIT Manufacturing Firms,"
International Journal of Physical Distribution & Logistics
Hanament, Vol.23, No.7, pp.22-31 (1993) .
5. Barker, R. M., "Information System Development in a Global Environment," Business Forum, Winter/Spring, pp.57-59
(1993) .
6. Booch, G., Object-Driented Analysis and Design with
application, Second Edition, Benjamin/Cummings (1994) .
7. Booch, G. and J. Rumbaugh, Unified Method : for Object Oriented Development, Version 0.8, Rational Software
Corporation (1994) .
8. Bordoloi, B. and M. H. Lee, "An Object-Oriented View :
Productivity Comparion with Structured Development, "
Information Systems lIanagement, Winter, pp.22- 30 (1994) .
9. Bowles, A., "Get Ready --- Objects Will Move to MIS
Mainstream," Software Magazine, Febrary, pp.99-100 (1995) .
10. Chen, H., "Collaborative Systems: Solving the Vocabulary
Problem," Computer, May, pp.5S-66 (1994) .
11. Collins, C. M. and C. M. Parks, "Manufacturing Information Systems Issues : Software Architectures," Computers and Industrial Engineering, Vol. 21, No.I-4, pp.223-227 (1991).
12. Conger, S., The New Software Engineering, Wadsworth (1994) 13. Cowdrick, R. M., "Distributed CIM Systems - Planning for the Future," Computers and Industrial Engineering, Vol. 21, No.1-4, pp.1-4 (1991) .
14. Davenport, T. H. and J. E. Short, "The New Industrial
Engineering: Information Technology and Business Process
Redesign," Sloan Management Review, Summer, pp.11-27 (1990)
15. Davidson, W. H., "Beyond re-engineering : The three phases of business transformation," IBII Systems Journal, Vol. 32, No.1, pp.65-79 (1993) .
16. Davis, D., "Software Uses Grow with Computing Power Gains, " Manufacturing Systems, July, pp.72-S2 (1994).
17. Davis, G. B. and M. H. Olson, Management Information
Systems:Conceptual Foundations, Structure, and Development,
Second Edition, McGraw Hill (1975) .
IS. Due, R. T., "Object-Oriented Technology: The Economics of a New Paradigm," Information Systems Management, Summer,
pp.69-73 (1993) .
19. Elmasri, R. and S. B. Navathe, Fundamentals of Database
Systems, Benjamin/Cummings (1994).
20. Ettlie, `J. E., "New Links in the Supply Chain," Productin, February, pp.14-15 (1995) .
21. Everest, G. C. , "Data Base Management: The Next Generation," CIM Review, Fall, pp.31-43 (1990) .
22. Gehling, R. G. and M. L. Gibson, "Using Imaging to
Reengineering Business," Information Systems Management,
Spring, pp.55-60 (1995) .
23. Gessner, R. A., Manufacturing Information System, John Wiley & Sons (1984) .
24. Gopal, C. and G. Cahill, Logistics in Manufacturing,
Business One IRWIN (1992) .
25. Gronbaek, K., M. Kyng and P. Mogensen, "CSCW CHALLENGES:
COOPERATIVE DESIGN IN ENGINEERING PROJECTS," Communications
of the ACM Vol.36, No.4, June, pp.67-77 (1993) .
26. Grudin, J. , "CSCW," Communications of The ACM, Vol. 34, No .12, Dec, pp.31-34 (1991) .
27. Gunasekaran, A. , et. al. , "The design of Computer- Integrated Manufacturing Systems," International Journal of Production Economics, Vo1.34, pp.313-327 (1994) .
28. Gupta, U. G. and J. E. Biegel, "ManIS: Manufacturing
Information Systems," Computers and Industrial Engineering,
Vol.21, No.1-4, pp.235-239 (1991) .
29. Hammer, M., "Reengineering Work: Don`t Automate,
Oblitera te," Harvard Business Review, July-August,
pp.104-112 (1990) .
30. Hill, S. , "Gateway to the Enterprise, " Manufacturing Systems, February, pp.25-32 (1995) .
31. IBM Corporation, Business Systems Planning --- Information Systems Planning Cuide, IBM Document #CE20-0527-4 (1984) .
32. Jacobson, I., M. Christerson, P. Jonsson and G. Overgaard, Object-Oriented Software Engineering, revised printing, Addison-Wesley (1995) .
33.Jo1y, D., "OBJECT Methods Tame Reengineering Madness,"
Datamation, May, No.5, pp.43-44,48 (1995) .
34. Kappel, G. and S. Vieweg, "Database Requirements for CIM
Applications," Integrated Manufacturing Systems, Vo1.5,
No.4/5, pp.48-63 (1994) .
35. Kekre, S. and T. Mukhoopadhyay, "Impact of electronic data interchange on quality improvement and inventory reduction programs: Afield study," International Journal of Production Economics, Vo1.28, pp.265-282 (1992) .
36. Kim, C., K. Kim and 1. Choi, "An Object-Oriented Information Modeling Methodology for Manufacturing Information Systems," Computers and Industrial Engineering, Vol. 24, No.3, pp.337-353 (1993) .
37. Klapper, N. D., HI/IJIS : High Impact Manufacturing
Information Systems, Van Nostrand Reinhold (1992) .
38. Klein, M. M., "Reengineering Methodologies and Tools: A
Prescription for Enhancing Success," Information Systems
Management, Spring, pp.30-35 (1994) .
39. Kusiak, A., Intelligent Manufacturing Systems, Prentice
Ha 11 (1990)
40. Law, A. M. and W. D. Kelton, Simulation Modeling and Analysis, Second Edition, McGraw Hill (1990) .
41. Martin, J. and J. J. Odell, Object-Oriented Methods: A
Foundation, Prentice Hall (1995) .
42.Mitchell, F. H., CIM Systems: An Introduction to
Computer-Integrated Manufacturing, Prentice Hall (1991) .
43. Naquin, B. and D. Ali, "Active Database and Its Utilization In The Object Oriented Environment," Computers and Industrial Engineering, Vo1.25, No.1-4, pp.313-316 (1993)
44. Ngwenyama, O. K. and D. A. Grant, "Enterprise Modeling for CIM Information Systems Architectures: An Object-:-Oriented Approach," Computers and Industrial Engineering, Vol.26, No.2, pp.279-293 (1994) .
45.Nof, S. Y., Information and Collaborration Models of
Integration, Kluwer Academic Pubplishers (1993) .
46. Palmer, J., N. Fields, "Computer-Supported Cooperative
Work," Computer, May, pp.15-17 (1994) .
47. Parker, K., "Some Tactical Considerations," Manufacturing Systems, November, pp.2-3 (1994) .
48. Pei, D. and C. Cutone, "Object-Oriented Analysis and
Design:Realism or Impressionism," Information Systems
Management, Winter, pp.54-60 (1995).
49. Porter, M. E. and V. E. Millar, "How information gives you competitive advantage," Harvart Business Review, Ju1yAugust, pp.149-160 (1985) .
50. Rehg, J. A., Computer-Integrated Manufacturing, Prentice
Hall (1994) . .
51. Rembold, U., B. O. Nnaji and A. Storr, Computer Integrated Manufacturing and Engineering, Addison-Wesley (1993) .
52. Rochester, J. B. , "Redefining Computer- Integra ted
Manufacturing," I/S Analyzer, Vo1.30, No.8, pp.1-8 (1992)
53. Rumbaugh, J., M. Blaha, W. Premerlani, F. Eddy, and W.
Lorensen, Object-Oriented Modeling and Design, Prentice
Ha 11 (1 99 1) .
54. Rymer, J. R., "Distributed objects, BPR make a winning pair," Network World, November 7, pp.4l (1994) .
55. Sartori. L. G. , Manufacturing Information Systems,
Addison-Wesley (1988) .
56. Teng, J. T. C., Grover, V. and Fieldler, K. D., "Business Process Reengineering : Charting a Strategic Path for the Information Age," California Management Review, Spring, pp.9-31 (1994) .
57. Thomas, J., "LOGISTICS TRENDS," Distribution, September,
pp.6 (1994) .
58. Udoka, S. J., "Eleectronic Data Interchange(EDI) /
Electronic Graphics interchange and BAR Codes: fundamental
Components of Your World-Class Manufacturing Enterprise,"
Computers and Industrial Engineering, Vol. 25, No.1-4,
pp.139-142 (1993) .
59. Vajpayee, S. K., Principles Of Computer-Integrated
Manufacturing, Prentice Hall (1995) .
60. Vaughan, J., "Supply Chain Focus Enlivens Manufacturing
Processes," Software Magazine, March, pp.96-99 (1995) .
61. Vollmann, T. E., W. L. Berry and D. C. Whhybark,
Manufacturing Planning and Control Systems, IRWIN (1992) .
62. Wang, S., "00 Modeling of Business Process: Object-Oriented Systems Analysis," Information Systems Management, Spring, pp.36-43 (1994) .
63. Wilson, L., "Re-engineering the Workplace: New Foundations," Computerworld, May 1, pp.112-114 (1995) .
64. Wu, B., Manufacturing Systems Design and Analysis, Chapman & Hall (1992) ..
65. Yau, S. S. and J. P. Tsai, "A survey of software design
techniques," IEEE transaction of software engineering,
Vol.SE-12, No.6, pp.713-72l (1986) .
66. Yip, G. S., TOTAL GLOBAL STRATEGY ---Managing for Worldwide Competitive Advantage, Prentice Hall (1995) .
67. Yourdon, E., Modern Structure Analysis, Prentice-Hall,
Yourdon Press (1989)
68. Zhou, M., R. Greenwell and J. Tannock, "Object-oriented
methods for manufacturing information systems," Computer
Integrated Manufacturing Systems, Vol.?, No.2, pp.1l3-121
(1994) .
(二)中文部份
1 . Hammer , M. and J. Champy 原著,楊幼蘭譯,改造企業一再生
策略的藍本,牛頓(1993) .
2. Womack , J. P, D. J. Jones , and D. Roos 原著,李裕昆譯,改
變世界的企業經營體制一一臨界生產方式,中華企管( 1994) .
3. 王立志,「台灣產業對電腦整合製造之需求分析及系統發展之研究」,工業技術研究院委託學術機構研究報告( 1993) .
4. 王立志,林我聰,游錫濱,邱宏昇,與陳建光,「製造資訊系統個體導向系統分析方法」,工業工程學刊, Vol.11 , No.3 , pp.137一146 (1994) .
5. 古新賢,「運用物件導向塑模方法的電腦整合製造系統模式」,台灣工業技術學院管理技術研究所,碩士論文( 1994) .
6 .江立立,「軟體工程的歷史與軟體危機」,資訊與電腦,九月,pp.78-82 (1993) .
7. 江立立,「個體導向系統發展技術漫談」,資訊與電腦,九月,pp.120-124 (1993) .
8. 李淑英,「電腦整合製造資訊流程的探討」,政治大學資訊管理研究所,碩士論文(1994) .
9. 李慶耀,「發展製造系統離散事件模擬之C++類別庫」,交通大學工業工程研究所,碩士論文( 1993) .
10. 林我聰,智慧型現場排程系統之研究,資訊與電腦出版社 (1995) .
1 1.林英峰,全球化作業管理,生產管理課程講義 (1995) .
12. 林錦昌,「製造規劃與控制系統資訊需求分析方法論選擇之參考模式的建立」,東海大學工業工程研究所,碩士論文 (1992) .
13. 吳怡靜,「未來競爭十大方向:譯自『IMD 1994全球競爭力報告』」,
天下雜誌, 10 月(1994) .
14. 施保旭,個體導向技術導引,資訊與電腦出版社(1994) .
15. 黃炳錫,「企業採用EDI 系統及使用效益之研究一一以報關行為例」,淡江大學資訊管理研究所,碩士論文(1994) .
16. 雷邵辰,電腦整合製造(CIM) 一一CAD/CAM應用,松崗(1991) .
17. 葉子禎,「製造計畫與管制系統之資訊流程相關性探討」,東海大學工業工程研究所,碩士論文(1991) .
18. 陳建光,「製造資訊系統之整合性個體導向系統分析方法」,東海大學工業工程研究所,碩士論文( 1993) .
19. 賴士葆,生產/作業管理一一理論與實務,華泰( 1994) .
20. 戴建耘,「個體導向語言的基本特性與使用」,資訊與電腦,二月, pp.103-107 (1994) . |