English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 113160/144130 (79%)
Visitors : 50760177      Online Users : 745
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    政大機構典藏 > 商學院 > 資訊管理學系 > 會議論文 >  Item 140.119/75930
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/75930


    Title: A Process-Oriented System Dynamics Model for Software Development Project Prediction
    Authors: Chen, Chuen-lung;Wang, Chen-Shu;Lee, Ya-Hui;Lee, Yu-Min
    陳春龍
    Contributors: 資管系
    Date: 2008
    Issue Date: 2015-06-17 17:20:10 (UTC+8)
    Abstract: Project management is a typically experience centralized and process-driven activity. Various critical factors with interaction effect would decide project management success leads to complexity project management prediction problem. Project managers indeed require some assistance to reduce the uncertainty. To improve the predicament of project managers, this research built a process-oriented dynamics model that provides project managers a comprehensive systemically perspective to improve project prediction accurate rate, including: the project complexity prediction, the project staff allocation and the cost-revenue evaluation. As the experiment results demonstrated, the proposed model was successfully applied to simulate 41 real projects from an IT consultancy in Taiwan. The accurate rate of project complexity prediction is average 90%. Additionally, the proposed model enable project managers to simulate project staff allocation, including: PM, SA, SD and project programmer. Finally, the cost-revenue evaluation provide above 65% projects could achieve positive profit. These simulation results could successfully provide information for PM to reduce project management uncertainty.
    Relation: Networked Computing and Advanced Information Management - NCM , pp. 126-131
    Data Type: conference
    DOI 連結: http://dx.doi.org/10.1109/NCM.2008.174
    DOI: 10.1109/NCM.2008.174
    Appears in Collections:[資訊管理學系] 會議論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML2936View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback