|
English
|
正體中文
|
简体中文
|
Post-Print筆數 : 27 |
Items with full text/Total items : 113318/144297 (79%)
Visitors : 51056620
Online Users : 927
|
|
|
Loading...
|
Please use this identifier to cite or link to this item:
https://nccur.lib.nccu.edu.tw/handle/140.119/64052
|
Title: | 公共工程預算執行之策略性績效衡量指標之研究--平衡計分卡之應用 |
Other Titles: | A Study on the Strategic Performance Evaluation Measures for the Execution of Public Construction Budgets-An Application of the Balanced Scorecard |
Authors: | 劉正田;林維珩;袁玉珠 Liu, Jenten;Lin, Wei-heng;Yuan, Yuh-Ju |
Contributors: | 會計系 |
Keywords: | 公共工程;平衡計分卡;策略目標;績效衡量 Public construction;Balanced scorecard;Strategic targets;Performance measures |
Date: | 2002 |
Issue Date: | 2014-02-20 10:05:08 (UTC+8) |
Abstract: | 公共工程是促進國家經濟繁榮及提升人民生活品質不可或缺之一環,
如何建立有效的工程績效評估作業方式,加強預算、工期及品質的控制,發
揮管考功能,圓滿達成工程計畫目標,乃是政府面臨之重要課題。本文以平
衡計分卡之觀點,透過蒐集相關文獻與專家訪談,初擬公共工程預算執行之
14 項策略目標與42 項績效衡量指標,經由問卷研究及因素分析,建構公共
工程之策略具體行動化的整合性管理架構,共萃取「預算經費」、「品質安
保」、「控制與學習」、「執行與建議」、「預備作業」五項構面,36 項
策略績效指標。本文並針對各個構面及績效指標作變異數分析,發現如下:
公共工程考核人員較重視「預算經費」構面指標,執行人員較重視「品質安
保」、「控制與學習」及「預備作業」構面指標,年資較淺人員較重視「控
制與學習」構面指標。本研究可供政府部門連結策略目標與績效指標,以及
訂定獎懲制度之參考,有助於提昇公共工程之執行成效。 Public construction is a major momentum to continued economic
growth, and improves living standard of people. In order to improve the effective
control on cost, schedule and quality, a more effective way for performance
evaluation of public construction is indispensable. This study aims at the
development of strategic performance measures used in the performance
evaluation of public construction by adapting the system of balanced scorecard.
From literature and interviews with experts, we initially develop 14 strategic
targets and 42 measures for our questionnaire. The rating of these measures by
people in charge of the related activities was analyzed by factor analysis. The
result classifies 36 selected measures into five categories, namely, budget,
construction quality and environment protection, control and learning, execution
and suggestion, preparation, for use in evaluating public construction performance.
Results from analysis of variance are summarized as follows: Those who
evaluate public construction pay relatively more attention to budget factor.
Those who execute public construction pay relatively more attention to
construction quality administration and environment protection, execution and
suggestion, and preparation. Those who are less experienced pay relatively more
attention to control and learning. The findings of this study suggest one way to
link the strategic targets and the performance and to reward accordingly by the
government. Then effectiveness of public construction execution can be
improved. |
Relation: | 當代會計, 3(2), 149-181 |
Data Type: | article |
Appears in Collections: | [會計學系] 期刊論文
|
Files in This Item:
File |
Description |
Size | Format | |
149181.pdf | | 1376Kb | Adobe PDF2 | 1057 | View/Open |
|
All items in 政大典藏 are protected by copyright, with all rights reserved.
|
著作權政策宣告 Copyright Announcement1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.
2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(
nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(
nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.