Loading...
|
Please use this identifier to cite or link to this item:
https://nccur.lib.nccu.edu.tw/handle/140.119/35256
|
Title: | 零工式生產加班模式之研究 |
Authors: | 徐宗義 |
Contributors: | 陳春龍 徐宗義 |
Keywords: | 先進規劃與排程 排程 派工法則 加班 |
Date: | 2002 |
Issue Date: | 2009-09-18 14:34:01 (UTC+8) |
Abstract: | 由於科技快速的進步以及消費者需求型態的改變,現在的企業面臨到許多的挑戰。因此,企業的競爭型態還必須強調企業整合供應鏈的能力。然而這樣的改變對於企業傳統的生產規劃與排程系統來說是一個相當大的衝擊,因此,能夠妥善的分配有限資源並即時回應環境變動的先進規劃與排程(Advanced Planning and Scheduling; APS)系統成為了最近幾年相當重要的研究課題。而排程問題是其中相當重要的部分,但大部分的研究都是針對生產系統在正常的狀況下所做的討論,而在異常狀況下所做的研究略顯不足,因此本研究希望針對異常狀況發生時最常採取的加班決策來做探討,建立了一個較完整的加班決策模式,使APS系統更為完整,進而提昇企業資源規劃與供應鏈管理系統的使用效率。 With the rapid progression of technology and changing consumer demand, businesses are facing many challenges and required to be capable of integrating their supply chain. However, this also makes a great impact on the production planning and scheduling systems of traditional industries, and this makes APS, which could allocate limited resources and provide prompt response to the environmental changes, a hot topic. Scheduling problem is important, but most studies are still focusing on production systems under normal situation. Therefore, to make APS system more sound, the study will specifically center on overtime decision that mostly happens under abcdrmal situation, to build up a more complete overtime decision model that further increase the efficiency of enterprise resource planning and supply chain management system. |
Reference: | 1、 Appold, S. J., Harrison, B., and Kelley, M. R., 1993, “Spatially proximate inter-organizational networks, agglomeration economics, and technological performance in U.S. manufacturing”, Annual meeting of the association of American geographers. 2、 Baker, K. R. and Kanet, J. J., 1983, “Job Shop Scheduling with Modified Due Dates”, Journal of Operations Management, Vol. 4, 1, 11-22. 3、 Barnes and Jim, 1999, “Advancing your plans and schedules”, Automatic I.D. News Europe, Vol. 8, No.5, 42. 4、 Blackstone, J. H., Phillips, D. T. and Hogg, G. L., 1982, “A state-of-the art survey of dispatching rules for manufacturing job shop operations”, International Journal of Production Research, Vol. 20, No. 1. 5、 Brennan, L., Browne, J., Davis, B. J., O’kelly, M. E. J. and Gault, A. R., 1982, ”An Analysis of Overtime Decision”, International Journal of Operations and Production Management, Vol. 2, 19-36. 6、 Elvers, D. A., 1974, “The sensitivity of relative effectiveness of jobshop dispatching rules with respect to various arrival distributions”, IIE Transactions, Vol. 6, 1, 41-49. 7、 French, S., 1982, “Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop”, John Wiley & Sons. 8、 Gould and Lawrence, S., 1998, “Introducing APS: getting production in lock step with customer demand”, Automotive Manufacturing & Production, Vol.110, No. 5, 54-59. 9、 Haupt, R., 1989, “A Survey of Priority Rule-Based Scheduling”, OR Spektrum, Vol. 11, 3-16. 10、 Holloway C. A. and Nelson R. T., 1974, “Job Shop Scheduling with Due Dates and Overtime Capacity”, Management Science, Vol. 21, 1, 68-78. 11、 Holthaus, O., 1997, “Design of efficient job shop scheduling rules”, Computers and Industrial Engineering, Vol. 33, 1/2, 249-252. 12、 Holthaus, O. and Rajendran, C., 1997, “Efficient dispatching rules for scheduling in a job shop”, International Journal of Production Economics, Vol. 48, 87-105. 13、 Kenji Yura, 1994, “Production Scheduling to Satisfy Worker’s Preference for Days off and Overtime under Due-date Constraints”, International Journal of Production Economics, Vol. 33, 1-3, 265-270. 14、 Liu, K. C., 1998, “Dispatching rules for stochastic finite capacity scheduling”, Computers and Industrial Engineering, Vol. 35, 1, 113-116. 15、 Narasimhan, S. L., Mangiameli, P. M., 1987, “A comparison of sequencing rules for a two-stage hybrid flow shop”, Decision Sciences, Vol. 18, 250-265. 16、 Raghu, T. S. and Rajendran, C., 1993, “An efficient dynamic dispatching rule for scheduling in a job shop”, International Journal of Production Economics, Vol.32, 301-313. 17、 Ramasesh, R., 1990, “Dynamic job shop scheduling: a survey of simulation research”, OMEGA, Vol. 18, 43-57. 18、 Yamamoto, M. and Nof, S. Y., 1985, ”Scheduling/Rescheduling in the Manufacturing Operating System Environment”, International Journal of Production Research, Vol. 23, 705-722. 19、 王立志,民88,「系統化運籌與供應鏈管理」,滄海書局。 20、 周書賢,民90,「開放型工廠派工法則之模擬研究」,朝陽科技大學工業工程與管理系之碩士論文。 21、 范振家,民79,「減少誤期之排程處理-加班模式之建構」,國立中央大學機械工程研究所之碩士論文。 22、 徐政宏,民89,「多能工派工法則之模擬比較-以面臨緊急訂單之流線型生產系統為例」,朝陽科技大學工業工程與管理系之碩士論文。 23、 國立中央大學管理學院ERP中心,民91,「企對資源規劃導論」,旗標出版。 24、 陳怡聲,民91,「允許中斷之開放工廠總完工時間最小化問題之研究」,朝陽科技大學工業工程與管理系之碩士論文。 25、 陳昭呈,民81,「批量製造誤期現象之排程處理-加班模式之構建」,國立中央大學機械工程研究所之碩士論文。 26、 陳建良,1995,「排程概述」,機械工業雜誌第12月號,122-137。 27、 楊家冠、曾和枝、陳建良、王正文,民84,「製造業生產排程問題」,機械工業雜誌。 28、 蘇文政,民85,「零工工廠在異常環境下誤期縮減模式之構建」,私立元智工學院工業工程研究所之碩士論文。 |
Description: | 碩士 國立政治大學 資訊管理研究所 89356036 91 |
Source URI: | http://thesis.lib.nccu.edu.tw/record/#G0893560361 |
Data Type: | thesis |
Appears in Collections: | [資訊管理學系] 學位論文
|
Files in This Item:
File |
Size | Format | |
56036101.pdf | 223Kb | Adobe PDF2 | 1492 | View/Open |
|
All items in 政大典藏 are protected by copyright, with all rights reserved.
|