Reference: | [1] Amin, R.W. , Miller, R.W. (1993), “A robustness study of charts with variable sampling intervals”, Journal of Quality Technology, Vol. 25, pp. 36-44 [2] Baxley, R.V. (1995), “An application of variable sampling interval control charts”, Journal of Quality Technology, Vol. 27 , pp. 275-282 [3] Collani, E.V. , Saniga, E.M. , Weigand (1994), “Economic adjustment designs for control charts”, IIE Trans, Vol. 26, pp.37-43 [4] Duncan, A.J. (1956), “The Economic design of charts used to Maintain current control of a process”, Journal of American Statistical Association, Vol. 51, pp. 228-242 [5] Deming, W.E. (1982), “Quality, productivity and competition Position”, MIT Press, Cambridge, MA [6] Ho, C, Case, K (1994), “An economic design of the zone control chart for jointly monitoring process centering and variation”, Comput Indust Eng, Vol.26, pp.213–221 [7] Lorenzen, T. , Vance, L. (1986), “The Economic design of control charts: A unified approach”, Technometrics, Vol. 28, pp.3-10 [8] Montgomery, D.C. (1980), “The economic design of control charts: a review and literature survey”, Journal of Quality Technology, Vol. 12, pp.75-78 [9] Reynolds, M.R. (1996), “Shewhart and EWMA Variable Sampling Interval Control Charts with Sampling at Fixed Times”, Journal of Quality Technology, Vol. 28, pp. 199-212 [10] Reynolds, M.R. , Amin, R.W., Arnold, J.C., Nachlas, J.A. (1988), “ charts with variable sampling intervals”, Technometrics, Vol. 30, pp.181-192 [11] Reynolds, M.R. , Amin, R.W., Arnold, J.C. (1990), “CUSUM Charts with Variable Sampling Intervals”, Technometrics, Vol. 32, No. 4, November 1990, pp. 371-384 [12] Reynolds, M.R. , Arnold, J.C. , Baik, J.W. (1996), ” Variable sampling interval charts in the presence of correlation”, Journal of Quality Technology Vol. 28, pp. 1-28 [13] Runger, G.C. , Montgomery, D.C. (1993), “Variable sampling enhancements for Shewhart control charts”, IIE Transactions, Vol. 25, pp. 41-51 [14] Runger, G.C. , Pignatiello, J.J. (1991), “Variable sampling for process control”, Journal of Quality Technology, Vol. 23, pp. 135-155 [15] Shewhart W (1931), ”Economic control of quality of manufactured product”, D Van Nostrand, New York [16] Ross, S.M (1993), Introduction to probability models. Academic Press, New York [17] Vance, L.C. (1983), “A bibliography of statistical quality control chart techniques”, Journal of Quality Technology, Vol. 15, pp.59-62 [18] Woodall, W.H. (1986), “Weakness of the economic design of control charts”, Technometrics, Vol. 28, pp.408-409 [19] Saccuci, M.S. , Amin, R.W. , Lucas, J.M. (1992), “Exponentially weighted moving average control schemes with variable sampling intervals”, Communication in Statistics-Simulation and Computation, Vol. 21, pp. 627-657 [20] Svoboda, L. (1991), ”Economic design of control charts: a review and literature survey”, in Statistical Process Control in Manufacturing, J. B. Keats and D. C. Montgomery, Dekker, New York [21] Yang, S. , Yang, C. (2004), ”Economic statistical process control for over-adjusted process means”, International Journal Quality and Reliability Management, Vol. 21, pp. 412-424 [22] Yang, C. , Yang, S. (2006), ”Design of ASI control chart for controlling over-adjusted process mean”, ISBIS 5, Lima, Peru. |