English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 110944/141864 (78%)
Visitors : 48073297      Online Users : 316
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    政大機構典藏 > 教育學院 > 期刊論文 >  Item 140.119/141907
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/141907


    Title: Measuring project performance and dynamic risk management for engineering design alliance
    Authors: 顏敏仁
    Yan, Min-Ren
    Lee, Yung-Heng
    Contributors: 教育學院
    Keywords: System dynamics;Risk management;Casual loop;Engineering design project;Project management;Systems thinking
    Date: 2021-05
    Issue Date: 2022-09-19 15:17:15 (UTC+8)
    Abstract: Purpose
    The purpose of this study is to integrate modern decision sciences and develop a dynamic risk management model for international alliance engineering design projects.

    Design/methodology/approach
    To apply the model to real-world risk assessment and managerial decision-making, a mega project case study was conducted. System dynamics and computer simulations were used for improving quantitative analyses and scenario planning.

    Findings
    Based on the consideration and analyses of different cooperation risk factors, ripple effects of design error is found to be the key factor of subcontract management in international alliance projects in this study.

    Research limitations/implications
    This study provides a rationale for dynamic risk management decisions and enables international alliance companies to systematically control the cooperation risks in the execution of projects.

    Practical implications
    In the dynamic project management process, a significant increase in the design error rate does not unilaterally occur but is caused by subcontract and other management errors as a system problem. Integrative solutions with systems thinking would help the management.

    Originality/value
    This study proposed a framework of measuring project performance and dynamic risk management. The benchmarked case study demonstrates the capability of the proposed model for the feedback learning of business lessons and knowledge accumulations.
    Relation: Measuring Business Excellence, 25(1), 2-23
    Data Type: article
    DOI 連結: https://doi.org/10.1108/MBE-04-2020-0054
    DOI: 10.1108/MBE-04-2020-0054
    Appears in Collections:[教育學院] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML2109View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback